CASE STUDIES
Bioremediation Projects
Overall Soil Treatment
Process: Advanced biological, mechanical & chemical treatment
of contaminated soil via microenfractionation®
using the Microenfractionator®
in conjunction with H&H biologicals and chemical amendments in a
windrow type compost configuration.
| Job
Identification |
Time Line |
Soil Treated |
Contaminant Treated |
Contaminant Level |
Success Indicators (Reduced
to:) |
|
Woodburn, OR. UST Site #24-91-4347 |
386
days
(exp. site)* |
200
cubic yards Clay w/silt |
Used
Motor Oil |
39,000
mg/kg |
380
mg/kg* TPH-D-EXT Target: 500 mg/kg |
|
Bremerton, WA UB 1-7-9 (school site) |
67 days |
400 cubic yards
Silt/clay & 63% fines |
#2 heating oil |
2,400 mg/kg |
110 mg/kg TPH-D |
|
Bremerton, WA UB 2 (school site) |
67
days |
400
cubic yards silt/clay/63% fines |
#2
heating oil |
2,400
mg/kg |
53
mg/kg TPH-D |
|
Olympia, WA 9335 |
44 days |
170 cubic yards silt/clay/87%
fines |
Used Motor Oil |
1,500 mg/kg |
130 mg/kg TPH-D-EXT
Target: 200 mg/kg |
|
Olympia, WA 9335 |
44 days |
1,200 cubic yards
silt/clay/87% fines |
Weathered
gasoline |
3,000-6,000
mg/kg w/hot spots to 39,000mg/kg |
essentially
"non-detect Target: 200 mg/kg TPH-G |
|
Cle Elem, WA DNR 9311A |
7 days |
80 cubic yards sand/gravel |
Diesel |
530 mg/kg |
20 mg/kg TPH-D |
|
Cle Elem, WA DNR 9311B |
7 days |
120 cubic yards
sand/gravel |
Creosote |
1,000 mg/kg
TPH |
<5 mg/kg
TPH-D-EXT |
|
Cle Elem, WA DNR 9311C |
7 days |
120 cubic yards sand/gravel |
Pentachlorophenol
(PCP) |
87 mg/kg |
9.5 mg/kg PCP |
|
Powers, OR Georgia Pacific |
90 days |
160 cubic yards
classifying required |
Diesel |
1,500 mg/kg |
<100 mg/kg
TPH-D |
|
Vashon Island, WA 9364 |
33 days |
170 cubic yards silt/w/sand |
Gasoline |
1,333 mg/kg
high of 2,400 mg/kg |
2.8 mg/kg TPH-G |
|
Kent, WA Budget Truck Rental A |
18 days |
590 cubic yards
silt w/sand & cobbles |
Gasoline |
1,500 mg/kg |
<2 mg/kg
TPH-G |
|
Kent, WA Budget Truck Rental B |
17 days |
1,225 cubic yards
silt w/sand & cobbles |
Gasoline |
3,000 mg/kg |
4 mg/kg TPH-G |
|
Kent, WA Budget Truck Rental C |
10 days |
3,500 cubic yards
silt w/sand & cobbles |
Gasoline |
3,000 mg/kg |
8 mg/kg TPH-G |
|
WA Site in King Co. |
149 days |
6,000 cubic yards |
Oil/grease impacted |
1,720 mg/kg
TPH w/high up to 4100 mg/kg |
373 mg/kg TPH |
|
Osceola, WI Former USAF station |
194 days |
1,100 cubic yards |
PVOC's, PAH's
& Lead |
1,100-3,400
mg/kg diesel, BTEX level from 500-1500 mg/kg lead levels 5mg/kg |
<50mg/kg
(diesel and BTEX) reduced PAH levels 50% lead unchanged |
|
Medford, OR |
29 days |
4,512 cubic yards |
Diesel |
2,000 mg/kg |
178 mg/kg TPH-D
Target: 500mg/kg |
|
Alaska |
12 days |
190 cubic yards |
Diesel/gasoline |
413 mg/kg (diesel)
305mg/kg (gas) |
72 mg/kg (diesel)
target: 200mg/kg benzene "non-detect" GRO <10mg/kg
target: 100mg/kg |
|
Kenai, AK (airport fuel service) |
70 days |
160 cubic yards |
Diesel |
1,330 mg/kg |
160 mg/kg DRO
target: 200mg/kg (level B) |
|
Camp Pendleton, CA |
71 days |
615 cubic yards |
Jet Fuel |
1800 mg/kg TPH |
76 mg/kg TPH
met "clean requirments" |
|
Jones County, MS |
90 days |
20,000 cubic
yards |
Crude Oil |
20,000 mg/kg |
750 mg/kg TPH;
target: 500 mg/kg |
|
Huntington Beach, CA |
134 days |
3,000 cubic yards |
Light Crude Oil |
6,600 mg/kg |
Less than 1,000 mg/kg |
|
Panama, OK |
48 days |
500 cubic yards |
Creosote and PCP |
PAHs 3,000 mg/kg
PCP 210 mg/kg |
95% PAH removal
and <100 mg/kg PCP |
|
Savannah River
Site, Aiken SC |
100 days |
1,200 cubic yards |
PCBs, DDT, DDE, DDD,
Endrin, Heptachlor, and Silvex |
Up to 20,000 µg/kg |
Less than 1,000 µg/kg |
Chemical Treatment Projects
Overall Soil Treatment Process: Treatment involves
microenfractionation®
using the H&H Eco Systems Microenfractionator®
, adding and microenfractionating an oxidation catalyst into the soil,
then microenfractionating again after the addition of a chemical oxidant
in a windrow type compost configuration.
|
Job Identification |
Time Line |
Amt./Type Soil Treated |
Contaminant Treated |
Contaminant Level (avg.) |
Success Indicators (Reduced to=) |
|
Ridgefield, WA Soil Field Test A |
6 days |
50 cubic yards fine gravel/rock w/silt |
Cresote/Diesel |
2,000 mg/kg |
280 mg/kg in 20hrs 140mg/kg in 6 days Target: 200 mg/kg |
|
Ridgefield, WA Soil Field Test B |
6
days |
50 cubic yards fine gravel/rock w/silt |
Pentachlorophenol (PCP) |
68 mg/kg |
22 mg/kg in 20hrs 7.8 mg/kg in 6 days Target: 8.3 mg/kg |
|
Ft. Bragg, CA Feasibility Study/In-house lab |
3 days |
30 gallons (feasibility study) |
Pentachlorophenol (PCP) |
1,100 mg/kg |
51.5 mg/kg |
|
Olympia, WA Soil field Test/chlorodane |
6
days* |
75 cubic yards fine silt/clay |
Chlordane |
23,000 mg/kg |
4,000 mg/kg* |
|
Olympia, WA Soil field Test/Heptachlor |
6 days* |
75 cubic yards fine silt/clay |
Heptachlor |
28,000 mg/kg |
13,000 mg/kg* |
|
Los Alamos National Laboratories |
28 days |
900 kg (on-site feasibility study) |
TNT and RDX (high energy explosives) |
900 mg/kg TNT 13,000 mg/kg RDX |
<10 mg/kg
TNT <200 mg/kg |
| New
Brighton, MN |
?? |
1,200
cubic yards ??? |
Carcinogenic PAH's and PCP |
?? mg/kg
cPAHs
?? mg/kg PCP |
cPAHs ??
<100 mg/kg PCP |
|
Brooklyn Ctr., MN |
166 days |
1,190 cubic yards fine grained w/ high levels of
organic matter |
Pentachlorophenol (PCP) |
160 mg/kg |
Reduced from 160 mg/kg to 24 mg/kg in 30 days;then
reduced to 4.8 mg/kg by 4/13/98 Target: 150 mg/kg |
| Brooklyn
Ctr., MN |
2 days |
1,190 cubic yards fine grained w/high levels of organic matter |
C-PAH compounds associated w/creosote
|
258 mg/kg |
Reduced from to 60.15 mg/kg in 48 hours; contaminant level
dropped to 52.7 mg/kg by 10-12-98 Target: 100 mg/kg |
| *Further treatment on
these sites delayed by weather. |
Fixation Projects Overall Soil Treatment
Process: A chemical additive is blended into the soil and
the moisture is maintained at an optimal content. These additives
are typically a sulfate or phosphate based chemical that binds to metals
and causes them to salt out. Another treatment involves manipulating
the pH, which can help maintain the metal in an insoluble form.
| Job Identification |
Time Line |
Soil Treated |
Contaminant Treated |
Contaminant Level |
Success Indicators
(Reduced to:) |
|
Vancouver, WA |
3 days |
300 cubic yards |
Lead |
Up to 1,500 mg/kg |
<10 mg/kg leachable |
| St. Charles, MO |
7 days |
2,250 cubic
yards |
Lead |
Up to 202
mg/kg |
<5 mg/kg, down
to 1 mg/kg |
|
Tijuana, Mexico |
1 week |
300 cubic yards |
Lead |
Up to 224,000 mg/kg total lead |
Reduced leachability to <1 mg/kg |
|